(1) When installing the die, open the slider to the dead center and the closing height is correct.
(2) After the preliminary positioning belt of the die is tightened, jog the punch to approach the die. At the same time, screw the punch nut to align the die in the process of observation to ensure that the clearance around the die remains the same and equal.
(3) Tighten the mold of NC servo feeder. After inching, pay attention to observe the alignment of the mold, and then carry out the part test punching. After the test punching, check whether the part has flash, and make local adjustment to no flash.
(4) The mold must be clamped firmly to avoid damage to the mold and NC servo feeder.
5) When operating the NC servo feeder, you should concentrate. You can't chat with others while working. You can't wear gloves during operation. You should put the workpiece in place and start it again. After each workpiece is flushed, your hands and feet must leave the button or pedal to avoid misoperation.
(6) During continuous punching, we should pay attention to saving blank to reduce the input cost. The best way is to pay attention to the spacing between blank and die, scientific calculation and operation.
(7) After the operation of NC servo feeder is completed, the power supply of the equipment shall be cut off first, then the surrounding environment of the equipment shall be cleaned, and the workpieces, tools, molds, etc. shall be placed neatly for the convenience of the next shift of operators.
